Shape Image
Shape Image

JYOTI HYDRO INJECTOHOSE

Product Description

JYOTI HYDRO INJECTOHOSE is an innovative injectable hose system featuring unique flexible solid PVC construction with sponge strip and nylon braiding reinforcement. Designed for permanent installation in concrete joints, it provides superior waterproofing by sealing cracks and voids against water and saltwater ingress.

Typical Applications

The HYDRO INJECTOHOSE system is ideal for sealing construction joints in:

Water Retaining Structures

Basements, water tanks, reservoirs, and treatment plants

Underground Construction

Tunnels, subways, and underground parking

Marine Structures

Piers, docks, and sea walls exposed to saltwater

Civil Infrastructure

Bridges, dams, and other critical concrete structures

Key Advantages

High Pressure Resistance

Tested to withstand water pressures up to 10 bar (100m head)

Multiple Injection Capability

Unique valve system allows repeated injections over time

Material Compatibility

Works with acrylic/polyurethane resins and micro-fine cement

Easy Installation

Simple to install during concrete pouring

Versatile Applications

Suitable for diverse structures and construction methods

Quality Certified

Compliant with DIN EN ISO 868 standards

Technical Specifications

Standard Sizes Available

Inner Diameter Outer Diameter
6mm 13mm
7mm 19mm
10mm 25mm

Material Properties

Property Value
Tensile Strength 13.00 MPa
Elongation at Break 280%
Hardness (Shore A) 80-85
Water Absorption 0.12% in 24 hours

Installation Guidelines

Surface Preparation

The installation surface must be:

  • Trowel-finished and structurally sound
  • Clean and free from contamination
  • Dry and free from standing water

Fixing Procedure

  1. Secure injection and vent hoses using JYOTI hose clips and accessories
  2. Maintain 200-250mm spacing between fixings to prevent floating during concrete pour
  3. Install sealing caps at vent hose ends to prevent concrete ingress

Injection Process (After 28-Day Concrete Cure)

  1. Locate vent hose and remove sealing cap
  2. Attach appropriate injection nipples and accessories
  3. Fill hose with injection material until flow appears at opposite end
  4. Plug the end and pressurize the system
  5. Maintain pressure for 5 minutes after injection with no pressure loss
  6. Repeat procedure from opposite end for even distribution

Pro Tip

Better results are achieved using moderate pressure over longer duration rather than high pressure for short periods. For optimal performance, concrete should be minimum 28 days old before injection.

Product Supply

Standard Packaging

Supplied in 100-meter rolls complete with all necessary installation accessories

Health & Safety

No known health hazards associated with normal product use. Standard construction safety practices should be followed during installation.